Current City Construction Projects
|
| Project |
Description |
Bellaire Phase 2 (TxDOT grant)
Safe Routes to School |
Was bid June 2010 and awarded after TxDOT approval in November 2010. Construction began February 2011 and is 70% complete. |
Bellaire Phase 3 (35th Yr CDBG)
Pecan to Greenway |
Was bid by Tarrant County and awarded in July 2010. Construction began February 2011 and is 90% complete. |
Calloway Channel
Arcadia St. to Melbourne Rd. |
The City is in the final design stages of a stream bank rehabilitation project along Calloway channel. |
Northeast Tarrant Express |
TxDOT is expanding Airport Fwy and 820 from I-35W to the eastern limits of Tarrant County. City utility relocations are required and are currently under construction.
http://www.northtarrantexpress.com/ |
Michael St. Reconstruction (500 block)
Wanda Way to Bluebonnet |
This project includes paving, draining, water and sanitary sewer improvements. Will begin construction in 2012. |
| |
|
| Completed City Construction Projects |
| Projects |
Description |
Bellaire Phase 1 (City only)
Greenway to SH 10 (E. Hurst Blvd) |
The City of Hurst, North Central Texas Council of Governments, and TxDOT are working together on a street reconstruction and Safe Routes to School project on Bellaire Dr. from E. Pecan to SH 10 (E. Hurst Blvd).
Construction on Phase I is complete. |
Redbud Reconstruction
(500 block) (34th Yr CDBG) |
This project will include paving, draining, water and sanitary sewer improvements. The project was bid by Tarrant County and awarded in July 2010. Construction is complete. |
20th Year Storm Drain Improvements |
City is currently designing various improvements throughout the City. Phase 1 was designed as Lingston Dr. and was bid in January 2011. Construction is complete. |
| 20th Year Sewer Replacement |
Project was bid in December 2010 and awarded. Construction is complete. |
| 20th Year Water Replacement |
Project was bid inJuly 2010 and awarded. Construction is complete. |
2009 Large Valve Replacement |
Added two large valves and replaced one on water distribution system |
S. Precinct Line Rd. Sewer
SH 10 to FW City Limits |
The City of Hurst relocated a 12” sewer for a joint Ft. Worth-TxDOT project. The project was bid and construction completed November 2011. |
2008 Residential Water Replacement |
Construction began in January 2010 andwas completed July 2010. |
2008 Residential Sewer Replacement |
Annual sewer replacement program. Construction began in October 2009 and was completed in January 2010. |
Precinct Line Rd.
(Airport Fwy to Grapevine Hwy) |
The City relocated utilities for the TxDOT street widening.. |
Pipeline Rd.
Precinct Line Rd to Billie Ruth Dr |
Various street improvements for the Pipeline corridor |
Hayes Ln
Yates to Lorean Branch |
The City of Hurst worked with the City of Bedford to add piped storm drain improvements.. |
Tanglewood (300 block) |
33rd CDBG Project: Street reconstruction |
Arthur Dr
Cullum to Redbud |
Street reconstruction |
NE Mall Turn Lane |
The City and TxDOT coordinated to add a turn lane on NE Loop 820 access road |
| |
|